Nameplate Capacity
- 300.000 t/y ( feed gasoil)
- 260.000 t/y (feed VN IQ120)
- (1 compression line)
- (822 t/d x 365 d/y)
Energetic Index
- 7200 Kcal/Kg ethylene
- (1 compression line)
Furnaces
- N° 4 Selas furnaces duty 43x106 Kcal/h
- N° 5 Foster Wheeler furnaces duty 15x106 Kcal/h
- N° 2 Foster Wheeler Ethane recycle furnaces duty15x106 Kcal/h.
Feedstocks
- Gasoil 32%
- Virgin Naphta 54%
- Raffinate 13%
- LPG
- C5 Aromatics cut 1%
- Condensate on availability
Charge Gas Compressor
- Compressor C1
- Electric Driver 14 MWatt
- 260.000 t/y of ethylene
- Compressor C6
- Turbine driver 14 MWatt
- 186.000 t/y ethylene
- Light ends Splitter
- column 1500 days
- reboiler 200 days
- column 1000 days
- reboiler 200 days
- Caustic concentration 4%
- Caustic consumption 2 Kg/t ethylene
- Ethylene Splitter
- Start up 1986 capacity 300.000 t/y of ethylene
- Acethylene Reactors
- Inlet T 50°C I e 60°C II
- End of run T 60°C I e 70°C II
- regeneration cycle 210 days
- molar ratio 1,1 I e 1,7 II
- MAPD Reactors
- catalyst CCI C-31
- inlet T 75°C
- regeneration cycle 4 years
- Catalyst life 28 years
- Compressor C3
- turbine driver
- Compressor C8
- electric driver 3,5 MWatt
- Compressor C2
- backpressure turbine
- The backpressure turbine CT-2A has a power of
- 9 Mwatt and is suitable to one compression line run
- Compressor C7
- condensing turbine
- CT-7 turbine has a power of 10,5 Mwatt and is suitable to two compression lines run